機房介紹

江蘇常州高電機房

2022-06-07

辦公商務一體化的數據中心園區
Customized Integrated Data Center Park

        常州鐘樓綠色數據中心位于江蘇省常州市鐘樓開發區桂花路以西、棕櫚路以北、京杭大運河以東、華東云計算基地內,緊鄰江宜高速,于2015年7月開工,設計等級新國標A級,2016年12月投入運行。

Changzhou Zhonglou Data Center is located in East China Cloud Computing Base, at the intersection of Guihua Road and Zonglv Road, east side of the Beijing-Hangzhou Grand Canal, adjacent to Shanghai-Nanjing Highway. The project  started construction work in July 2015. The 1st phase project opened in December 2016, the design level is  equivalent to grade A of the new national standard.




基礎數據(DC 2#) 
Basic Data 

樓層
Floor

模塊編號
Module No.

機柜數量(R)
Racks

模塊面積()
Module Area

2

201~202

164 × 2

300 × 2

3

301~304

164 × 4

300 × 4

4

401~404

174 × 4

300 × 4

5

501~504

174 × 4

300 × 4

6

601~604

174 × 4

300 × 4

合計 Total

3072

5400





建設參數
Construction Parameters 

  • 地理位置 Location

蘇省常州市鐘樓經濟開發區桂花路22號
No. 2 Guihua Road, Zhonglou Economic Development Zone, Changzhou, Jiangsu






  • 建筑設計 Building

鋼筋混凝土框架結構體系 
Ferroconcrete frame structure

層高一層6.9m,二至六層5.6m
Story heights: 1st floor: 6.9m, 2nd-6th floor: 5.6m

地板承重12KN/㎡
Loading capacity: 12KN/㎡

專用貨運電梯及貨物卸載區,貨梯載重3.5噸 
Freight elevator (3.5 tons), loading bay

  • 電力系統 Power Supply

雙路供電,供電容量40000KVA,支持定制電力改造
Dual paths, power supply capability: 40,000KVA, support electricity renovation

UPS系統2N冗余配置,滿載后備電力15分鐘
UPS system with 2N redundant configuration; UPS battery backup time at rated load: 15minutes

柴發采用N+1配置,滿載后備供電12小時
Diesel generator with N+1 redundant configuration, operating 12 hours without refueling

單機柜電力20A~36A,局部可按需改造
Each rack power: 20A~36A; partial rack power could be expanded


  • 冷系統 Air Conditioning

機房使用精密空調調節室內溫度和濕度
Precision air-conditioners control IDC temperature and humidity 

空調系統采用UPS電源供電,空調冗余N+1
N+1 redundant air-conditioning system powered by UPS

地板下送風,上回風,冷通道封閉(冷熱通道嚴格隔離)
Down-flow air supply, up-flow air return, enclosed cold passages (cold and hot passages are isolated)

水冷,給水中斷的情況下系統24小時的正常運行;蓄冷罐15分鐘不間斷制
Water cooling system operates 24 hours without water supply; cold storage tank provides 15 minutes’ cooling in case chillers fail 

  • 消防系統 Fire-Fighting

采用IG541自動氣體滅火系統
IG541 automatic gas fire-fighting system

分區相互獨立,可以實現分區滅火,此外配備手持式滅火器及空氣呼吸器
Independent zone for fire-fighting separately, each zone equipped with handheld extinguisher and air-breather 

與空調、新風、門禁、計算機供電和市電等系統聯動
Linked air-conditioning, air, access control, computer power supply and city power etc. system

  • 安保系統 Security

可根據用戶需求定點增加高清攝像設備
HD cameras could be added as needed on spot

授權門禁系統、紅外探測,支持重點區域設施改造
Access control system, infrared detection, renovation for key area infrastructure 

人員權限設置,設備安全管理,多層安全防范與管理
Staff permission setting, devices safety management, multi-levels security protection and management

  • 網絡環境 Connectivity

中國移動等
Backbone network link to China Mobile 

多線均萬兆對接,可隨時根據實際需求進行擴容
Tens of gigabit multiline, scalable as needed 

提供144芯裸纖資源,可支持鏈路改造
144 core bare fiber resource, supporting link renovation



  • 管理服務 Management

7×24小時值守,5 分鐘內響應,15分鐘內應急處理反饋
7×24 hours guarding, quick response in 5 minutes, emergency processing and feedback in 15 minutes

擁有完備的應急方案、完善的應急管理流程,切實保障業務連續性
Complete emergency solutions and emergency management process to guarantee business continuity